Research note: Meta details Prometheus, its Ohio AI supercluster heading for about 1 million GPUs
How we checked Meta’s Prometheus figures and which ones are Meta’s own measurements.
At a glance
2searches run
3sources read
2sources used
6facts labelled
Mixedevidence strength · 3 of 5 facts (60%)
From sources to story
Read3
Used2
Cited2
Official1
Archived2
How sure we are, fact by fact
- Confirmed · 3
- Company claim · 2
- Not known · 1
Evidence map
| Fact | Label | 1OFF | 2OUT |
|---|---|---|---|
| Prometheus is in New Albany, Ohio, and trained Meta’s Muse models. | Confirmed | ||
| It has hundreds of thousands of GPUs and is being scaled toward roughly 1 million. | Confirmed | ||
| It uses Nvidia GB200 and GB300 NVL72 racks, with Vera Rubin NVL72 coming. | Confirmed | ||
| Meta reports goodput above 85% for pre-training and above 90% for RL runs. | Company claim | ||
| Interruptions fell 99% from a mid-2025 peak, per Meta. | Company claim | ||
| The site’s exact power capacity. | Not known |
Question
What we set out to check
Where Prometheus is, how big it is, what hardware it uses and how reliable Meta says it is.
Findings
What we found
- Meta’s post gives the location, GPU scale, rack types, network and reliability numbers.
- StorageReview repeats the same figures and adds that one 32,768-GPU run used 523 racks including spares.
- Meta does not give a power figure in watts, only “gigawatt-scale”.
Discrepancies
Numbers that differ
Meta first reports a mean time between interruptions of about 47,000 GPU hours, later above 54,000. Both are in the post; we use the later figure.
Method
Labels we chose and why
- Confirmed for location, scale and hardware from Meta’s post.
- Claim for goodput and interruption figures, which are Meta’s own measurements.
Open questions
What we could not verify
- The site’s exact power capacity.
- Independent checks of the reliability figures.
Can you help confirm one of these? Send us a source. When we find an answer, we update this note and the story, with the date.
Next steps
How we could improve this
Look for local utility or planning filings that give the site’s power capacity.
Research timeline
- Research20 Oct 2026
- Research note published20 Oct 2026, 13:27 IST
- Story published20 Oct 2026, 13:37 IST
What we searched
- Meta Prometheus supercluster New Albany Ohio gigawatt October 2026
- Meta "Prometheus" supercluster engineering blog 1 million GPUs Hyperion
Every source we read
| Source | Used? | Why |
|---|---|---|
| Engineering at Meta Archived copy | USED | Primary source. |
| StorageReview Archived copy | USED | Independent write-up that matches the figures. |
| Converge Digest | NOT USED | Similar summary. |